Download Print this page

ATTACK PELLET Series Instructions For Use Manual page 16

Voiler for combustion of wooden pellets

Advertisement

Maintenance of heating system and boiler
At least once a fortnight check or refill water in the heating system. If the boiler is out of
operation during winter, water can be frost in the system. Therefore it is better to discharge
water of the system or fill in with antifreeze agent. Otherwise discharge water only in critical
situations and for the shortest time as possible. Twice a week pull and push the turbulator
control lever a few times to clean pipe exchangers. Then take ash out of the ash collector below
the burner (for boilers with no automatic cleaning).
After heating season is finished, clean the
boiler thoroughly
, replace damaged parts.
Changing the packing cord of the door
Dismantle the old packing cord with a screwdriver and clean the rabbet where it was placed.
Take a new packing cord and put its beginning on the horizontal parts of the rabbet. With your
hand or a light knock of a hammer press it into the rabbet on the circumference of the door.
Adjustment of hinges
After some time a packing cord in the door gets deformed. To repack the door, it is necessary to
change the position of the door. The position is changed by tightening the hinges of the door.
Feeding door is joined to the body with two hinges attached to the door with a long pin. To
change the adjustment of the hinges, it is necessary to remove the pin and screw the hinge by
turning it. Fit the door and insert the pin into the hinge.
16

Advertisement

loading

This manual is also suitable for:

Pellet 20 aPellet 30 a