Supporting the Front of the
Machine with the Jack
1.
Unload all material from the hopper.
2.
Park the machine on a level surface, engage the
parking brake, shut of the engine, remove the
key, and wait for all moving parts to stop before
leaving the operator's seat.
3.
Chock the tires.
4.
Remove the pin that secure the jack to the hitch
tube
(Figure
27).
Figure 27
1. Hitch tube
2. Pin
5.
Rotate the jack vertical
6.
Insert the pin through the horizontal holes on the
jack and hitch tube
7.
Lower the jack to support the machine.
Stowing the Jack
1.
Align the drawbar of the traction unit with the
hitch tube of the machine, engage the parking
brake, shut of the engine, remove the key, and
wait for all moving parts to stop before leaving
the operator's seat.
2.
Secure the hitch tube to the drawbar with the
hitch pin.
3. Jack
(Figure
27).
(Figure
27).
3.
Raise the jack.
4.
Remove the pin
1. Hitch tube
2. Pin
5.
Rotate the jack horizontal
6.
Insert the pin through the horizontal holes on the
jack and hitch tube
g272502
27
(Figure
28).
Figure 28
3. Jack
(Figure
28).
(Figure
28).
g272501