EMC Connectrix B Series Hardware Reference Manual page 6

Hide thumbs Also See for Connectrix B Series:
Table of Contents

Advertisement

Contents
Chapter 4
Chapter 5
Chapter 6
6
EMC Connectrix B Series ED-48000B Hardware Reference Manual
Customize a switch name................................................................ 49
Set the Domain ID............................................................................. 50
Verify the PID mode and connect to the fabric............................. 51
Enable software licenses .................................................................. 53
Back up the configuration ............................................................... 54
Overview............................................................................................ 56
Port blades ......................................................................................... 57
CP blades ........................................................................................... 61
Power supplies.................................................................................. 63
Blower assemblies............................................................................. 65
WWN card ......................................................................................... 67
Cable management tray................................................................... 70
Overview............................................................................................ 72
Replacing the cable management tray........................................... 73
Replacing a port blade and filler panel ......................................... 77
Removing a port blade ............................................................. 81
Replacing a CP blade........................................................................ 85
Replacing a power supply and filler panel ................................... 96
Replacing a blower assembly........................................................ 100
Replacing the WWN bezel and card ............................................ 104
Installing and removing SFPs in a port blade ............................ 112
Overview.......................................................................................... 114
Time required .................................................................................. 114
Items required ................................................................................. 115
Verify need for replacement .......................................................... 116
Record critical switch and SAN information.............................. 117
Disconnect from network and fabric ........................................... 122
Remove components from chassis ............................................... 123
Remove and replace chassis.......................................................... 125
Install components into new chassis............................................ 127
Install modems (optional) ............................................................. 129
Verify correct operation of hardware........................................... 130
Configure new chassis serial number.......................................... 130
Verify correct operation of system................................................ 131
Reconnect system to network and fabric .................................... 133

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ed-48000b

Table of Contents