Chassis Replacement
128
EMC Connectrix B Series ED-48000B Hardware Reference Manual
3. Put on an ESD grounding strap and attach it to the grounding
strap connector on the chassis (see
location of grounding connector).
4. Install the WWN card and bezel in the new chassis as described in
"Replacing the WWN bezel and card" on page
5. Install the blower assemblies in the new chassis as described in
"Replacing a blower assembly" on page
6. Install the CP blades in the new chassis as described in
"Replacing a CP blade" on page
7. Install the port blades or filler panels in the new chassis as
described in
"Replacing a port blade and filler panel" on page
8. Install the power supplies or filler panels in the new chassis as
described in
"Replacing a power supply and filler panel" on
page
96.
Figure 1 on page 19
104.
100.
85.
for
77.