a. Verify that your wrist strap is grounded to the chassis of the
ED-48000B director. Adjust the wristband so that there are no
gaps between the band and your skin.
b. Secure the FC2-16 blade in place. Make sure that you unscrew
the latches and that they are open when you push the blade
into the chassis.
c. Connect the Fibre Channel cables to the new blade.
6. Verify that all your blades are detected by the switch, complete
POST, and are enabled using the slotShow command. If a blade
faults or hangs in POST, call your switch service provider.
7. Validate the installation by running the following commands:
nsShow, nsAllShow, and fabricShow. All of your connected
servers, storage, and switches should be present in the output of
these commands. If there is a discrepancy, it is possible that a
device or switch is not able to connect to the fabric and further
troubleshooting is necessary. For more information see
"Validating the installation" on page
This completes the task of adding FC2-16 blades to an ED-48000B
director.
Blade Support Notes
150.
Installing port blade procedures
149