Installing Standoff S - Valor LX1 Installation Manual

Hide thumbs Also See for LX1:
Table of Contents

Advertisement

Appliance Preparation
Install Top Standoff s
If installing using combustible framing, the included
standoff s on top of the unit must be set up. When
shipped, the standoff s are installed laying fl at against the
unit and screwed in at one end.
Each standoff has three perforated lines on it. Fold along
the perforations to create a triangular shape.
28
Once all four standoff s are folded up, screw each one
down at its remaining connection point.
Fold x3
Combustible framing above the fi replace may not be
used below the top of the installed standoff s.
If installing the Steel Framing Kit, you may simply
unscrew and discard the standoff s.