Wood Framing - Valor LX1 Installation Manual

Hide thumbs Also See for LX1:
Table of Contents

Advertisement

Installation Planning
 WARNING
Ensure weight of wall above is
NOT carried by the appliance.
Zero clearance stand-
off s (2 front, 2 rear).
11-1/4"
[286 mm]
8"
[204 mm]
15"
[381 mm]
2"
[51 mm]
10-1/4"
[261 mm]
Combustible framing
material allowed.
14
HeatShift plenum or duct plates framing required (top,
front, or sides). See "Appendix D" in this manual.
 WARNING
There are restrictions for where drilling and
screwing may take place. See page 18 for details.

Wood Framing

Requires steel stud
under outlet open-
ing when using LDK4
plenum.
Combustible framing
material. See "Appendix
D" for details.
HeatShift pipes (4)
5" Ø connect to ple-
num or termination
plates above, see
Appendix D.
1/2" [13 mm] non-
combustible cement
board required in this
zone. May be covered
with max. 3/4" [19 mm]
combustible fi nish.
Combustible projec-
tions must otherwise
conform to allowable
clearances. See "Clear-
ances to Combustibles"
on page 13.
Max 1-1/4" [32 mm]
thickness combustible
wall fi nish allowed, if
within 4" of opening.
18-1/2"
[470 mm]

Advertisement

Table of Contents
loading

Table of Contents