Mounting and Connecting the Primary and
Secondary Unit(s)
The inverter is typically mounted vertically, and the instructions in this section are
applicable for vertical installation. Some SolarEdge i nverters model can be installed
horizontally (above 10° tilt) as well as vertically. For information and instructions for
horizontal mounting refer to
http://www.solaredge.com/sites/default/files/application_note_horizontal_mounting_
of_three_phase_inverters.pdf
First mount the Primary Unit then the Secondary Unit(s).
NOTE
Make sure the mounting surface or structure can support the weight of the inverter and brackets, and
make sure that it spans the width of the mounting brackets.
CAUTION!
HEAVY OBJECT. To avoid muscle strain or back injury, use proper lifting techniques, and if required - a
lifting aid.
ATTENTION
Objet lourd. Pour éviter la fatigue musculaire ou des blessures au dos, utilisez des techniques de levage
appropriées et, si nécessaire - un auxiliaire de levage lors du retrait.
CAUTION!
SolarEdge inverters can be installed at a minimum distance of 50 m/ 164 ft from the shoreline of an
ocean or other saline environment, as long as there are no direct salt water splashes on the inverter.
AVERTISSEMENT!
Les onduleurs SolarEdge peuvent être installés à une distance minimum de 50m de la ligne d'eau de
l'océan ou autre environnement salin, tant qu'il n'y a pas d'éclaboussements d'eau salée directs sur
l'onduleur.
1. Determine the inverter mounting location, on a wall or stud framing . I t is recommended to mount
the inverter in a location protected from direct sunlight.
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.4
Chapter 3: Installing the Primary and Secondary Unit(s)
Figure 17: Mounting bracket
29