Version History
Version 1.4 - December 2018
l
Updated communication options and menus.
l
Updated guidelines for use of extension cabels in power optimizer installation.
l
Version 1.3 - November 2018
l
Deleted cable insulation stripping image and step from 'To connect AC from ground'
l
Added caution about lug types.
l
Modified maximum lug tongue thickness to 0.16"
l
Changed "shrinks" to "heat shrink".
l
Added option for mounting inverter without using a level
l
Modified supported AC grids to 480V and 208V (modified i n 1.2) . Modified image.
l
Modified' the opposite polarity DC Conductors in the same conduit' note (for 480V inverters use
l
1000 r ated cables and for 2 08V inverters use 6 00 VDC rated cables)
Added step 'Disconnect the AC to the inverter by turning OFF the circuit breakers on the
l
distribution panel' in Replacing a Secondary Unit
Specifications
l
Updated 'Recommended OCPD size per grid'
o
Added SE43.2-US values to Fault current contribution table
o
Deleted DC Surge Protection and DC Fuses on Plus & Minus
o
Version 1.2 - October 2018
l
Addition of possibility to use compatible connectors from third-party manufacturers
l
Update regarding use of extension cables in power optimiser installation guidelines
l
Recommendation to mount the power optimiser in a location protected from direct sunlight
l
Addition of caution - installation in saline environment
l
Addition of link to the Designer web page
l
Updated warning about sealing unused power optimiser input connectors
l
Output safe voltage is 1V (±0.1V)
l
Changed Connection Unit cover torque size to 10.3 N*m
l
Mounting a nd Connecting the Primary and Secondary Unit(s) section and procedure , step 10,
l
modified sub step a to 'Position the cable so that the arrows are facing you' .
Version 1.1 - Editorial updates (March 2018)
l
Version 1 - (February 2018)
l