Secondary Unit Interface; Opening Conduit Drill Guides - SolarEdge SE66.6KUS Installation Manual

Three phase inverter with synergy technology
Hide thumbs Also See for SE66.6KUS:
Table of Contents

Advertisement

Secondary Unit Interface

 
The Secondary units connectors are for connection to the Primary Unit:
l
 
DC (MC4) connectors: for connection of the PV installation
o
 
Communication connector: for communication options
o
 
AC connector: for connection of the AC 
o

Opening Conduit Drill Guides

This section describes how to open the AC and DC drill guides.
This step may be performed before or after mounting the inverter.
To open conduit drill guides:
 1.  Ensure that the Connection Unit and inverter   O N/OFF switch are set to OFF.
 2.  Loosen the screws on the front cover of the Connection Unit.
 3.  Remove the Connection Unit cover. 
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.4
Chapter 3: Installing the Primary and Secondary Unit(s)
Figure 14: Secondary Unit interface
Figure 15: Opening the Connection Unit cover
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se100kusSe43.2kus

Table of Contents