SolarEdge SE66.6KUS Installation Manual page 39

Three phase inverter with synergy technology
Hide thumbs Also See for SE66.6KUS:
Table of Contents

Advertisement

Connecting the AC Grid and Grounding to the Connection Unit
To connect AC and ground:
WARNING!
Turn OFF the AC before connecting the AC terminals.
 1.  Turn OFF the AC circuit breaker.
 2.  Open the Connection Unit cover: Release the six Allen screws and carefully move the cover 
horizontally before lowering it.
CAUTION!
When removing the cover, make sure not to damage internal components. SolarEdge will not be
held responsible for any components damaged as a result of incautious cover removal.
 3.  Remove the terminal block   c over. 
 4.  Insert the cable through the AC drill guide that was opened.
NOTE
Connect the equipment grounding before connecting the AC wires to the AC terminal block.
Veillez à relier le conducteur de PE (la terre) avant de connecter les fils CA au bornier CA.
 5.  Connect the grounding wire to the grounding terminal block and tighten with a torque   o f 
15N*m / 12 lb*ft.
 6.  Remove the screws from the AC terminal blocks.
NOTE
Apply heat shrink insulation to the lug barrels.
38
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se100kusSe43.2kus

Table of Contents