Mounting And Connecting The Primary And Secondary Unit(S) - SolarEdge SE8K-N4 Installation Manual

Three phase inverter with synergy technology
Table of Contents

Advertisement

Mounting and Connecting the Primary and
Secondary Unit(s)
The inverter is typically mounted vertically, and the instructions in this section are 
applicable for vertical installation. Some SolarEdge   i nverters model can be installed 
horizontally (above 10° tilt) as well as vertically. For information and instructions for 
horizontal mounting refer to 
http://www.solaredge.com/sites/default/files/application_note_horizontal_mounting_
of_three_phase_inverters.pdf
First mount the Primary Unit then the Secondary Unit(s). 
NOTE
Make sure the mounting surface or structure can support the weight of the inverter and brackets, and
make sure that it spans the width of the mounting brackets.
CAUTION!
HEAVY OBJECT. To avoid muscle strain or back injury, use proper lifting techniques, and if required - a
lifting aid.
 1.  Determine the inverter mounting location, on a wall or stud framing .   I t is recommended to mount 
the inverter in a location protected from direct sunlight.
Three Phase Inverter with synergy technology Guide MAN-01-00402-1.1
Chapter 3: Installing the Primary and Secondary Unit(s)
Figure 13: Mounting bracket
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se7k-n4Se5k-n4Se4k-n4Se3k-n4

Table of Contents