Monitoring Platform

Monitoring Platform
The   m onitoring platform enables monitoring the technical and financial performance of one or more 
SolarEdge sites. It provides past and present information on the system performance both at the system 
and module levels.
Supported AC Grids
The following section shows the AC grids supported by the inverters (model dependent).
Ground connection is required for all grids, as described in Connecting the AC Grid and Grounding to the 
Connection Unit  on page 37.
Figure 3: AC grids supported by SolarEdge three-phase inverters
NOTE
 Some three phase inverters support the 208V Delta grid. Refer to Setting the Inverter to 
Support 208V 3-wire Grid on page 41.

Installation Procedure

The following is the procedure for installing and setting up a new SolarEdge site. Many of these also apply 
to modification of an existing site.
 1.  Installing the Power optimisers,  page 14
 2.  Mounting and Connecting the Primary and Secondary Unit(s), page 29
NOTE
It is recommended to connect communication connections (step 6 of this installation) before
connecting the AC, for easier access to the communication board.
 3.  Connecting the AC and the Strings to the Connection Unit ,37
 4.  Activating and Commissioning the System Using SetApp, page 42
 5. 
Configuring the   S
ystem Using SetApp ,page 44
 6.  Setting Up Communication page 57                                                            
 
12
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.4