SolarEdge SE66.6KUS Installation Manual page 70

Three phase inverter with synergy technology
Hide thumbs Also See for SE66.6KUS:
Table of Contents

Advertisement

 3.  Check that S_OK - Server Connected status appears in the main inverter section:
Power
100 kW
P_OK: 138 of 141
Optimizers Connected
Status
Production
CosPhi
1.00
Voltage
850 Vdc
Commissioning
 4.  Scroll down to the Communication section and check that the communication options are as 
required. For more information refer to Communication Status on page 51.
Communication
LAN
Connected
Cellular
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.4
Status
Inverter
SN 07318000C
Voltage
Frequency
277 Vac
60.9 Hz
S_OK
Server Connected
Switch
ON
Limit
Country
No Limit
Temp
156 F
RS485-1
RS485-2
SE Slave
Modbus
NC
ZigBee
N/A
NC
Chapter 6: Setting Up Communication
USA2
Fan
OK
2 of 2