Creating Logical And Physical Layout Using Installation Information; Designer; Mapper Application; Physical Layout Editor - SolarEdge SE66.6KUS Installation Manual

Three phase inverter with synergy technology
Hide thumbs Also See for SE66.6KUS:
Table of Contents

Advertisement

Creating Logical and Physical Layout using Installation
Information
To display a logical layout, insert the inverterserial number in the new site created in the monitoring 
platform. When the communication between the inverter and the monitoring server is established, the 
logical layout is displayed.
To display a physical layout, you need to map the locations of the installed power optimisers. To map the 
locations, use one of the methods described in the next sections.

Designer

Designer recommends   i nverter and power optimizer selection per site size and enables 
report generation.You can create a project in Designer and export the site design with 
the string layout to the monitoring platform. 
For more information, refer to https://www.solaredge.com/products/installer-
tools/designer#/.

Mapper Application

Use the Mapper smart phone application     t o scan the power optimiser and inverter 2D bar-codes and 
create a virtual map of a PV site for enhanced monitoring and easier maintenance.
Th Mapper application is integrated with the   m onitoring platform and enables:
 
Simple on-site registration of new systems.
l
 
Creating, editing and verifying system physical layout.
l
 
Scanning and assigning the power optimiser serial number to the correct module in the system 
l
physical layout.
For detailed information, refer to the Mapper demo movies:
 
Creating new sites using the Mapper mobile application
l
 
Mapping existing sites using the Mapper mobile application
l
 
 
 
 
 
 

Physical Layout Editor

 1.  If you are a registered installer, access the monitoring platform site creation page at  
https://monitoring.solaredge.com/solaredge-web/p/home#createSites. If you 
have not yet signed up, go to https://monitoring.solaredge.com/solaredge-
web/p/createSelfNewInstaller.
 2.  Fill out all required information in the screen, which includes information about 
your installation, as well as details about its logical and physical mapping.
 
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.4
Chapter 5: Activating, Commissioning and Configuring the System Using the Inverter
55