Site Status - SolarEdge SE66.6KUS Installation Manual

Three phase inverter with synergy technology
Hide thumbs Also See for SE66.6KUS:
Table of Contents

Advertisement

Site Status

The Site status screen shows the accumulated status of all inverters connected to a master inverter in a 
chain (bus) and the master inverter status.
For inverters with secondary units, the status of secondary units is displayed on the screen. If a 
secondary unit is not operating, its column is grayed-out.
Production
1.00 MW
SN 07318000C
Power
100 kW
P_OK: 141 0f 141
Optimizers Connected
Status
Production
CosPhi
1.00
Inverter Units
Secondary 1
N/C
Voltage
N/A
P_OK
N/A
Temperature
N/A
Fan
N/A
Switch Off. Production disabled
Commissioning
 
Site status: 
l
 
Production: The AC output power
o
 
Limit: Limitation setting (Export or Production)
o
 
Inverters: Number of   c onnected inverters in the cluster, including the master.
o
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.4
Chapter 5: Activating, Commissioning and Configuring the System Using the Inverter
Status
Site
Limit
Inverters
1.00 MW
10/10
Inverter
Voltage
Frequency
277 Vac
60.9 Hz
S_OK
Server Connected
Switch
OFF
Limit
Country
Export
USA2
Primary
Secondary 2
SN 07318000C
SN 07318000E
Voltage
Voltage
850 Vdc
850 Vdc
P_OK
P_OK
47 0f 47
47 0f 47
Temperature
Temperature
156 F
156 F
Fan
Fan
OK
OK
       ›
49

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se100kusSe43.2kus

Table of Contents