Chapter 6: Setting Up Communication - SolarEdge SE66.6KUS Installation Manual

Three phase inverter with synergy technology
Hide thumbs Also See for SE66.6KUS:
Table of Contents

Advertisement

Chapter 6: Setting Up Communication

The inverter sends the following information to the monitoring platform:
 
Power optimiser information received via the DC power lines (the PV output circuit)
l
 
Inverter information 
l
 
Information of any other connected devices
l
 
This chapter describes setting up communication between: 
 
the inverter and the monitoring platform through the Internet (wired/ wireless), or through a cellular 
l
connection
 
multiple inverters   f or a master/slave configuration
l
Communication setup is not required for power harvesting, however it is needed for using the 
monitoring platform.
NOTE
It is recommended to connect communication connections before connecting the AC, for easier
access to the communication board.
CAUTION!
When connecting the communication cables, make sure that the ON/OFF/P switch on the Connection
Unit is turned OFF, and the AC is turned OFF.
When configuring the communication parameters, make sure that the ON/OFF/P switch on the
Connection Unit is OFF, and the AC is turned ON.
ATTENTION!
Lors de la connexion des câbles de communication, assurez-vous que l'interrupteur MARCHE/ARRÊT
à la base de l'onduleur soit en position ARRÊT, et le CA est en position ARRÊT. Lors de la
configuration des paramètres de communication, assurez-vous que l'interrupteur MARCHE/ARRÊT
soit en position ARRÊT, et le CA est en position MARCHE.
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.4
Chapter 6: Setting Up Communication
57

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se100kusSe43.2kus

Table of Contents