Replacing Power Optimisers
5. In the monitoring platform, use the Replace button i n the logical layout tab (in site
Admin). Replace the serial number of the removed power optimiser with the serial
number of the newly installed power optimiser. Refer to
https://www.solaredge.us/sites/default/files/se-monitoring-portal-site-admin.pdf
82
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.4