CAUTION!
Installing a SolarEdge system without ensuring compatibility of the module connectors with the
optimiser connectors may be unsafe and could cause functionality problems such as ground faults,
resulting in inverter shut down. To ensure mechanical compatibility of the SolarEdge optimisers'
connectors with the PV modules' connectors to which they are connected:
Use identical connectors from the same manufacturer and of the same type on both the power
l
optimisers and on the modules; or
Verify that the connectors are compatible in the following way:
l
The module connector manufacturer should explicitly verify compatibility with the SolarEdge
o
optimiser connector; and
A third-party test report by one of the listed external labs (TUV, VDE, Bureau Veritas UL, CSA,
o
InterTek) should be obtained, verifying the compatibility of the connectors.
ATTENTION!
Les connecteurs du module doivent être mécaniquement compatibles avec les optimiseurs de
puissance. Sinon, le système SolarEdge installé peut être dangereux ou causer des problèmes
fonctionnels, tels que les défauts de terre, qui peuvent provoquer un arrêt de l'onduleur. Afin d'assurer la
compatibilité mécanique entre les optimiseurs de puissance SolarEdge et les modules auxquels ils sont
connectés:.
Utiliser des connecteurs identiques du même fabricant et du même type aussi bien pour les
l
optimiseurs de puissance que pour les modules.
Vérifiez que les connecteurs sont compatibles de la manière suivante:
l
Le fabricant du connecteur doit explicitement vérifier la compatibilité avec le connecteur
o
SolarEdge.
Un rapport de test de tierce partie doit être effectué par l'un des laboratoires externes indiqués ci-
o
dessous:(TUV, VDE, Bureau Veritas UL, CSA,Intertek), qui vérifiera la compatibilité des
connecteurs.

Package Contents

 
Power optimisers
l
 
Stainless steel grounding lock washers
l

Installation Guidelines

 
Frame-mounted power optimisers are mounted directly on the module frame , 
l
regardless of racking system (rail-less or with rails). For installation of frame-mounted 
power optimisers, refer to http://www.solaredge.com/sites/default/files/installing_
frame_mounted_power_optimizers.pdf.
 
The steps in this chapter refer to module add-on power optimisers. For smart 
l
modules, start from Step 3: Connecting Power Optimisers in Strings on page 19 . Also 
refer to the documentation supplied with the smart modules.
 
The power optimiser can be placed in any orientation.
l
 
If connecting more modules than optimiser inputs in parallel, use a branch cable. Some commercial 
l
power optimiser models     h ave a dual input.
 
Position the power optimiser close enough to its module so that their cables can be connected.
l
 
Make sure to use power optimisers that have the required output conductor length:
l
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.4
Chapter 2: Installing the Power Optimisers
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se100kusSe43.2kus

Table of Contents