Installation Equipment List
Standard tools can be used during the installation of the SolarEdge system. The following is a
recommendation of the equipment needed for installation:
Allen screwdriver for 5mm screw type for the inverter cover, Connection Unit cover, and inverter side
l
screws
17/32 H EX Allen screwdriver for AC stud connector
l
SolarEdge supplied level
l
SolarEdge supplied DC / interlock conduit(s)
l
Standard flat-head screwdrivers set
l
Non-contact voltage detector
l
Cordless drill (with a torque clutch) or screwdriver and bits suitable for the surface on which the
l
inverter andoptimisers will be installed and for opening theConnection Unitdrill guides. Use of an
impact driver isnotallowed.
Appropriate mounting hardware ( for example: stainless bolts, nuts, and washers) for attaching:
l
the Primary and Secondary Unit(s) mounting brackets to the mounting surface
o
the power optimisers to the racking (not required for smart modules)
o
4xM8 ring terminals and suitable crimper
l
Wire cutters
l
Wire strippers
l
Voltmeter
l
For installing the communication options, you may also need the following:
For Ethernet:
l
CAT5/6 twisted pair Ethernet cable with RJ45 connector
o
If using a CAT5/6 cable spool: RJ45 plug and RJ45 crimper
o
For RS485:
l
Four- or six-wire shielded twisted pair cable.
o
Watchmaker precision screwdriver set
o
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.4
Chapter 1: Introducing the SolarEdge Power Harvesting System
13