Step 2: Commissioning and Configuring the
Installation
This section describes how to use the SetApp menus for commissioning and configuring the inverter 
settings.
Menus may vary in your application depending on your system type. 
To access the Commissioning screen:
Do one of the following:
 
During first time installation: Upon Activation completion, in the SetApp, tap Start Commissioning. 
l
The main Commissioning menu screen is displayed.
 
If the inverter has already been activated and commissioned:
l
 a.  If not already ON - turn ON AC to the inverter by turning ON the circuit breaker on the main 
distribution panel. 
 b.  If not already ON - move the Connection Unit switch to the ON position.  
 c.  Open   S etApp and follow the instructions on the screen (scan the inverter bar-code; move the 
ON/OFF/P switch to P position (for less than 5 sec) and release). 
The mobile device creates a Wi-Fi connection with the inverter and displays the main 
Commissioning screen.
In the main   m enus, tap the menu red arrows (
task. Tap the Back   a rrow (
The next sections provide more information about configuration options (in addition to Country and
Language and Pairing, described in Step 2: Commissioning and Configuring the Installation on page 43).

Setting Country and Language

 1.  From the Commissioning screen select Country and Language .
 2.  From the Country drop-down list, select the required country setting. 
WARNING!
The inverter must be configured to the proper setting in order to ensure that it complies with the
country grid code and functions properly with the country grids.
AVERTISSEMENT!
L'onduleur doit être configuré pour le pays approprié afin d'assurer un fonctionnement convenable
avec le réseau de ce pays.
 3.  From the Language drop-down list, select the language.
 4.  Tap Set Language.  

Pairing

Once all connections are made, all the power optimisers must be logically paired to their inverter. The 
poweroptimisers do not start producing power until they are paired. This step describes how to assign 
each inverter to the poweroptimisers from which it will produce power.
 Perform this step when the modules are exposed to sunlight. If the string length is changed or a power 
optimiser is replaced, repeat the pairing process.
 1.  From the main menu, select Pairing.
 2.  Tap Start Pairing. 
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.4
Chapter 5: Activating, Commissioning and Configuring the System Using the Inverter
) to perform the system commissioning or configuration 
) to return to the previous menu.