Installing Optional Parts - Huawei FusionServer Pro CH121 V5 User Manual

Compute node
Table of Contents

Advertisement

FusionServer Pro CH121 V5 Compute Node
User Guide
Step 4 Take the compute nodes out of the ESD bags and place them separately on the ESD floor.
Figure 4-3 Proper operation
Figure 4-4 Improper operations
----End

4.2.3 Installing Optional Parts

Before installing and configuring a compute node, you need to install all optional parts
required, such as extra CPUs, drives, and mezzanine cards.
Procedure
Step 1 Install the optional parts for the CH121 V5.
For details, see
----End
Issue 06 (2019-08-10)
NOTE
Take out the compute node only before you install it immediately.
5.2 Optional
Copyright © Huawei Technologies Co., Ltd.
Parts.
4 Installation and Configuration
74

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents