Huawei FusionServer Pro CH121 V5 User Manual page 120

Compute node
Table of Contents

Advertisement

FusionServer Pro CH121 V5 Compute Node
User Guide
Step 11 Check whether a PCIe card is installed.
l
l
Step 12 Install the PCIe card.
For details, see
Step 13 Install the air duct.
For details, see
Step 14 Install the cover.
For details, see
Step 15 Install the compute node.
For details, see
Step 16 Power on the compute node.
For details, see
Step 17 Check whether the memory module is replaced successfully.
1.
2.
Issue 06 (2019-08-10)
The two memory ejectors are closed automatically after the memory module is firmly
seated.
NOTE
Do not touch the edge connector on a memory module with bare hands. Before installing a
memory module, ensure that the edge connector is not contaminated.
Figure 5-24 Installing a memory module
If yes, go to
Step
12.
If no, go to
Step
13.
3.12 Installing a PCIe
3.8 Installing the Air
3.6 Installing the
3.4 Installing a CH121
3.2 Power-On
Log in to the iBMC WebUI.
For details, see
12.2 Logging In to the iBMC
Choose Information > System Info > Memory, and check the memory information.
Copyright © Huawei Technologies Co., Ltd.
Card.
Duct.
Cover.
V5.
Procedure.
WebUI.
5 Optional Part Installation
112

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents