Installing A Mezzanine Card - Huawei FusionServer Pro CH121 V5 User Manual

Compute node
Table of Contents

Advertisement

FusionServer Pro CH121 V5 Compute Node
User Guide

5.2.6 Installing a Mezzanine Card

Procedure
Step 1 Power off the compute node.
For details, see
Step 2 Remove the compute node.
For details, see
Step 3 Place the compute node on the ESD workstation.
Step 4 Remove the cover.
For details, see
Step 5 Take the spare part out of its ESD bag.
Step 6 Determine the position of the mezzanine card.
Figure 5-9 Numbering and positions of mezzanine cards
Step 7 Install the mezzanine cards.
1.
2.
3.
Issue 06 (2019-08-10)
3.1 Power-Off
3.3 Removing a CH121
3.5 Removing the
Align the lower mezzanine card with the positioning holes and metallic studs on the
mounting base, and press the mezzanine card vertically downwards into the connector on
the mainboard. See (1) in
Tighten the two captive screws c and d (shown in
mezzanine card.
Align the upper mezzanine card with the positioning holes and metallic studs on the
mounting base, and press the mezzanine card vertically downwards into the connector on
the mainboard. See (2) in
Copyright © Huawei Technologies Co., Ltd.
Procedure.
V5.
Cover.
Figure
5-10.
Figure
5-10.
5 Optional Part Installation
Figure
5-10) to secure the lower
101

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents