4.1 Installation Environment Requirements

4.2 Hardware Installation
4.3 Initial Configuration
4.1 Installation Environment Requirements

4.1.1 Space and Airflow Requirements

To allow for servicing and adequate airflow, observe the following space and airflow
requirements:
l
l
l
l
l

4.1.2 Temperature and Humidity Requirements

To ensure continued safe and reliable equipment operation, install or position the system in a
well-ventilated, climate-controlled environment.
l
l
Issue 06 (2019-08-10)
4

Installation and Configuration

Install the server in an access-restricted area.
Keep the area in which the server is located clean and tidy.
To facilitate heat dissipation and maintenance, keep a clearance of 800 mm (31.50 in.)
between walls and the front and rear doors of the cabinet.
Do not block the air intake vents. Otherwise, air intaking and heat dissipation will be
affected.
The air conditioning system in the equipment room provides enough wind to ensure
proper heat dissipation of all components.
Use temperature control devices all year long in any climates.
In dry and humid areas, maintain ambient humidity within range with humidifiers and
dehumidifiers respectively.