FusionServer Pro CH121 V5 Compute Node
User Guide
Step 10 Install the cover.
For details, see
Step 11 Install the compute node.
For details, see
Step 12 Power on the compute node.
For details, see
----End
3.11 Removing a PCIe Card
Procedure
Step 1 Power off the compute node.
For details, see
Step 2 Remove the compute node.
For details, see
Step 3 Place the compute node on the ESD workstation.
Step 4 Remove the cover.
For details, see
Step 5 Remove the air duct.
For details, see
Issue 06 (2019-08-10)
Figure 3-16 Installing a PCIe card panel
3.6 Installing the
3.4 Installing a CH121
3.2 Power-On
3.1 Power-Off
3.3 Removing a CH121
3.5 Removing the
3.7 Removing the Air
Copyright © Huawei Technologies Co., Ltd.
Cover.
V5.
Procedure.
Procedure.
V5.
Cover.
Ducts.
3 Basic Operations
41