Table 4-1 Temperature and humidity requirements in the equipment room
Item
Temperature
Humidity

4.1.3 Cabinet Requirements

l
l

4.2 Hardware Installation

4.2.1 Installation Overview

Figure 4-1 Installation process
l
l
Issue 06 (2019-08-10)
A general 19-inch cabinet with a depth of more than 1000 mm (39.37 in.) which
complies with the International Electrotechnical Commission 297 (IEC 297) standard.
Air filters installed on cabinet doors.
Properly ground the server before installation to avoid damage to electronic components
from electrostatic discharge. Improper grounding may cause electrostatic discharge.
For details about how to prevent electrostatic discharge, see
Electrostatic Discharge
Before installing multiple components, read the installation instructions for all the
components and identify similar actions to simply the installation process.
Use the
Intelligent Computing Compatibility Checker
components supported.
Copyright © Huawei Technologies Co., Ltd.
Description
5ºC to 35ºC (41ºF to 95ºF)
8% RH to 90% RH (non-condensing)
.