Huawei FusionServer Pro CH121 V5 User Manual page 110

Compute node
Table of Contents

Advertisement

FusionServer Pro CH121 V5 Compute Node
User Guide
4.
Figure 5-10 Installing mezzanine cards
Step 8 Install the cover.
For details, see
Step 9 Install the compute node.
For details, see
Step 10 Power on the compute node.
For details, see
Step 11 Configure the BIOS, OS, switch, and FC disk array for the mezzanine cards.
l
l
l
l
Step 12 Check whether the mezzanine firmware version is the latest.
l
l
Issue 06 (2019-08-10)
Tighten the two captive screws a and b (shown in
mezzanine card.
3.6 Installing the
3.4 Installing a CH121
3.2 Power-On
BIOS configuration
For details, see the
user guide
OS configuration
For details, see the
user guide
Switch configuration
For details, see the configuration guide of the switch you use.
FC configuration
For details, see the configuration guide of the FC disk array you use.
If yes, no further action is required.
If no, go to
Step
13.
Copyright © Huawei Technologies Co., Ltd.
Cover.
V5.
Procedure.
of the mezzanine card you use.
of the mezzanine card you use.
5 Optional Part Installation
Figure
5-10) to secure the upper
102

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents