Siemens SITRANS F FUH1010 Series Operating Instructions Manual page 210

Nema 7 compact interface detector
Table of Contents

Advertisement

Installation Instructions
After determining the best sheet cutting pattern from suggestions above, mark the
pipe for the starting edge of the dry couplant sheet position.
Partially peel the sheet backing 1 to 2 inches from the starting edge, then carefully
locate and press against the pipe surface.
While pressing firmly and sliding your hand against the sheet (along the pipe surface),
slowly peel away the backing such that it prevents the trapping of air.
Apply the film slowly and carefully so that the sheet does not wrinkle, stretch or over-
lap, especially under the transducer contacting surfaces.
Use the wooden hand roller supplied to smooth the film and assure adhesion to the
pipe surface.
Apply additional layers (if required) while avoiding any seams under the transducers.
Use the wooden hand roller on each layer applied.
Record final thickness of CC129-1A (from Table 1) for later entry into the 1010GC flow-
meter.
WOODEN
ROLLER
4
CC129A-7
CC129-1A
CN4973 February 2005

Advertisement

Table of Contents
loading

Table of Contents