ABB Relion 615 Series Engineering Manual page 103

Ansi
Hide thumbs Also See for Relion 615 Series:
Table of Contents

Advertisement

1MAC108982-MB A
615 series ANSI
Engineering Manual
1.
Make a sketch of how to present the single-line diagram.
2.
Place the apparatus, transformer and other symbols that are needed for the single-
line diagram into the raster boxes.
3.
Add Junction points where needed.
4.
Link the apparatus symbols with line elements.
5.
In the Object Properties view, adjust the text symbols while writing to north,
east, south or west.
6.
Place measurements when needed.
7.
Edit the name, unit and the number of the measurements' decimals.
8.
Select each object that has a dynamic link and make the link to the corresponding
process object.
9.
Check that you have selected the correct function block.
Function blocks of the same type can have different instance numbers.
GUID-F21E4F43-442D-4868-BAA3-EBA903E9C62E-ANSI V1 EN
Figure 64:
Graphical Display Editor: establishing a dynamic object link
10. Ensure that all links are done.
11. Save the complete picture.
12. Write to the IED.
13. Validate the single-line diagram on the IED.
Section 6
LHMI engineering
95

Advertisement

Table of Contents
loading

Table of Contents