4.
Enter the device tag of the external measurement device.
5.
Set Process Variable to Temperature.
Postrequisites
Verify that the transmitter is receiving the external data. To do this:
• Using ProLink II, click ProLink→Process Variables and check the External Temperature value.
• Using the Field Communicator, select Overview→Primary Purpose Variables.
If the value is not correct:
1. Verify the HART tag of the external device.
2. Verify that the external device is powered up and online.
3. Verify the HART/mA connection between the transmitter and the external measurement device.
Configuration and Use Manual
Integrate the meter with the control system
151