Installation - Chrysler Sebring 2004 Service Manual

Table of Contents

Advertisement

8P - 6
SPEED CONTROL
VACUUM RESERVOIR (Continued)

INSTALLATION

(1) Connect vacuum hose to reservoir by inserting
nail head pegs on reservoir into the keyhole slots in
the frame rail and slide down to lock it into place.
(2) Install the vacuum reservoir (Fig. 7).
(3) Install bolt through to reservoir to frame rail.
(4) Install the front fascia, refer to the Frames and
Bumper/Front Fascia section for more information.
JR

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sebring convertible 2004Stratus 2004

Table of Contents