Alarms & Warnings - Vertiv VP8641 Manual

Intelligent rack pdu
Table of Contents

Advertisement

VERTIV INTELLIGENT RACK PDU
Outlet Operation:
1.
Click the desired Outlet Operation icon.
2.
The outlet's state is described by three descriptors:
State describes the outlet's current state (On/Off).
Pending State describes the state the outlet is currently transitioning to, if it is in the process of
switching.
Time To Action describes the time left before the pending action will take place. This is adjusted
using Delays.
3.
Select the operation you wish to perform:
On/Off turns on/off the selected outlet.
For an outlet currently on, Reboot cycles the outlet off, then back on after the reboot hold delay. For
an outlet currently off, Reboot turns the outlet on.
Cancel will cancel the current operation if it has not been completed yet.
Reset Energy will reset the total Energy measured in kWh for the selected outlet.
Reset Min Max Values will reset Min and Max values for Voltage and Current
4.
For operations involving the state of the outlet, setting Delay to True will use the current Delay configu-
ration for each outlet when performing the selected operation. Delays are configured in "Outlet Config-
uration".
5.
Select Submit to issue the action.
5.4.2. ALAR MS & W ARNINGS
The Alarms & Warnings page allows users to establish alarm or warning conditions (hereafter referred to
as "Events") for each power, circuit and outlet readings. Events are triggered when a measurement ex-
ceeds a user-defined threshold, either going above the threshold ("high-trip") or below it ("low-trip").
Figure 3-19 Outlet Operation Page