Vertiv Knurr DCM Assembly Instructions Manual

Vertiv Knurr DCM Assembly Instructions Manual

Colocation rack

Advertisement

Quick Links

Assembly Instructions
Knürr DCM
Colocation-Schrank
®
Knürr DCM
Colocation Rack
®

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Knurr DCM and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Vertiv Knurr DCM

  • Page 1 Assembly Instructions Knürr DCM Colocation-Schrank ® Knürr DCM Colocation Rack ®...
  • Page 2: Table Of Contents

    Power Distribution Unit Mounting......23 Vertiv | Knürr DCM® Colocation-Schrank | 01.143.999.9 | Index D | ECR. no 18729 | 01/19...
  • Page 3: Bitte Beachten Sie

    In particular, we accept no liability übernommen, die aus unsach ge mäßer Handhabung der Produkte for damages which result from incorrect use or operation of the entstehen. product. Vertiv | Knürr DCM® Colocation-Schrank | 01.143.999.9 | Index D | ECR. no 18729 | 01/19...
  • Page 4: Hervorhebungen Und Symbole

    Abständen auf ihre Funktion zu prüfen.. checked at regular intervals for their function. Nennstrom: bis zu 25A Rated current: up to 25A Vertiv | Knürr DCM® Colocation-Schrank | 01.143.999.9 | Index D | ECR. no 18729 | 01/19...
  • Page 5: Gewährleistung

    Normen und Vorschriften gebaut und tested in accordance with the relevant standards and regulations. geprüft worden. DIN EN 60950-1: 2006 DIN EN 60950-1: 2006 Vertiv | Knürr DCM® Colocation-Schrank | 01.143.999.9 | Index D | ECR. no 18729 | 01/19...
  • Page 6: Vor Der Montage

    • Do not exceed the maximum rack weight of 500 kg. Kranösen befestigen: Securing the crane eyelets: • Vier Kranösen M12 einschrauben (A). • Secure four M12 cranes eyelets (A). Vertiv | Knürr DCM® Colocation-Schrank | 01.143.999.9 | Index D | ECR. no 18729 | 01/19...
  • Page 7: Aufstellen

    Mit den optionalen Schwerlastrollen kann der Schrank auch zum The rack can also be moved to the installation site using the Aufstellort gefahren werden. optional heavy duty rollers. Vertiv | Knürr DCM® Colocation-Schrank | 01.143.999.9 | Index D | ECR. no 18729 | 01/19...
  • Page 8: Maximale Beladung

    1,500 kg, mobile 1,000 kg. Maximale Beladung pro HE beträgt 25 kg stationär. Maximum load per rack unit (U) is 25 kg stationary. Vertiv | Knürr DCM® Colocation-Schrank | 01.143.999.9 | Index D | ECR. no 18729 | 01/19...
  • Page 9: Montagehinweise

    The following shows the 3 compartment colocation rack. The Montageschritte für 2-fach Colocation-Schrank erfolgen analog. assembly procedure for 2 compartment colocation rack is per- formed in the same way. Vertiv | Knürr DCM® Colocation-Schrank | 01.143.999.9 | Index D | ECR. no 18729 | 01/19...
  • Page 10: Türen

    • Adjust the hinge (B2) and reattach it. • Erdungskabel unten am Türblatt wieder montieren (B3). • Reattach the earth cable on the bottom of the door leaf (B3). Vertiv | Knürr DCM® Colocation-Schrank | 01.143.999.9 | Index D | ECR. no 18729 | 01/19...
  • Page 11 (see 3.1). • Erdungs kabel wieder aufstecken. • Reconnect the earth cable. • Analog für alle weitere Türen. • Analogous for all other doors. Vertiv | Knürr DCM® Colocation-Schrank | 01.143.999.9 | Index D | ECR. no 18729 | 01/19...
  • Page 12 • Zwischenstange um 180° drehen und zusammen mit Stangenfüh- • Turn the intermediate lock rod through 180° and reattach it rung wieder montieren (F3). together with the rod guide (F3). 90° Vertiv | Knürr DCM® Colocation-Schrank | 01.143.999.9 | Index D | ECR. no 18729 | 01/19...
  • Page 13 • Endkappen wieder montieren (G3). • Reattach the end caps (G3). 1,0-1,5 Nm 1,0-1,5 Nm • Analog für alle weitere Türen. • Analogous for all other doors. Vertiv | Knürr DCM® Colocation-Schrank | 01.143.999.9 | Index D | ECR. no 18729 | 01/19...
  • Page 14: Seitenwand

    • Raise the side panel and detach it at the top (B3). Installation Montieren • Reinstall in reverse order of steps. • In umgekehrter Reihenfolge montieren. Vertiv | Knürr DCM® Colocation-Schrank | 01.143.999.9 | Index D | ECR. no 18729 | 01/19...
  • Page 15: 19"-Ebene

    Zum Verschieben der 19”-Ebene die Schrauben A nur lockern, To move the 19” rails, only loosen the screws A connected to the nicht entfernen! depth extrusion, do not remove them! Vertiv | Knürr DCM® Colocation-Schrank | 01.143.999.9 | Index D | ECR. no 18729 | 01/19...
  • Page 16: Montieren

    Montieren Installation TX 30 • In umgekehrter Reihenfolge montieren. • Reattach in reverse order of steps. • Anziehdrehmoment beachten. • Observe tightening torque. Vertiv | Knürr DCM® Colocation-Schrank | 01.143.999.9 | Index D | ECR. no 18729 | 01/19...
  • Page 17: Kabelkanäle

    • Pull out the shorter cable duct (B3) (disassembly of the rear 19” 19”-Profile nicht nötig). rails is not necessary). 65 cm 5,2 Nm TX 25 5,2 Nm TX 30 Vertiv | Knürr DCM® Colocation-Schrank | 01.143.999.9 | Index D | ECR. no 18729 | 01/19...
  • Page 18: Montieren

    (D3). • Kabelkanäle oben befestigen (E). • Secure the cable ducts at the top (E). 5,2 Nm TX 25 Vertiv | Knürr DCM® Colocation-Schrank | 01.143.999.9 | Index D | ECR. no 18729 | 01/19 5,2 Nm...
  • Page 19 Kabelkanäle Cable ducts • Abdeckungen wieder montieren (siehe 6.1). • Reattach the covers (see 6.1). Vertiv | Knürr DCM® Colocation-Schrank | 01.143.999.9 | Index D | ECR. no 18729 | 01/19...
  • Page 20: Schottwand

    – order no. 01.147.642.7. Haltewinkel befestigen Attach the support bracket 5,2 Nm TX 25 5,2 Nm TX 25 Vertiv | Knürr DCM® Colocation-Schrank | 01.143.999.9 | Index D | ECR. no 18729 | 01/19 5,2 Nm...
  • Page 21 • Schottwände befestigen (D). • Secure the partition panels (D). 5,2 Nm TX 25 Vertiv | Knürr DCM® Colocation-Schrank | 01.143.999.9 | Index D | ECR. no 18729 | 01/19...
  • Page 22: 3-Punkt-Verriegelung

    Bestehende Verriegelung demontieren Remove the existing locking system A, B Neue Zwischenstange mit Stangenführung montieren Attach new intermediate lock rod with rod guides 90° Vertiv | Knürr DCM® Colocation-Schrank | 01.143.999.9 | Index D | ECR. no 18729 | 01/19...
  • Page 23: Notizen

    PDU Montagemöglichkeiten finden Sie auf den Vertiv Webseiten be found on the Vertiv web pages under the following links: unter folgenden Links:  https://www.vertivco.com/de-emea/products-catalog/  https://www.vertivco.com/en-emea/products-catalog/ facilities-enclosures-and-racks/racks-and-containment/ facilities-enclosures-and-racks/racks-and-containment/ Vertiv | Knürr DCM® Colocation-Schrank | 01.143.999.9 | Index D | ECR. no 18729 | 01/19...
  • Page 24 © 2018 Vertiv Co. All rights reserved. Vertiv, the Vertiv logo are trademarks or registered trademarks of Vertiv Co. All other names and logos referred to are trade names, trademarks or registered trademarks of their respective owners.