S
A8:
A
tep
SSiGn Fixed RoUtinG
All fixed installation routing, such as monitor and meter outputs, can be set up using the consoles main routing procedure:
‰ Touch the menU (
bottom of the Touchscreen, followed by the miSc (
User Toolbox
1
PGM 2
‰ In the sub-menu that appears, touch the RoUte (
left-hand corner of the Touchscreen:
In addition, the right-hand side of the Master Control Strip will display Set, Setc, ShoW, inc, mUlti, and All
buttons.
Note that, while on this occasion these buttons are activated using the ROUTE button, functions are normally assigned
to these buttons using the buttons in the left-hand side of the Master Control Strip.
Master Control Strip
Routing operations follow a logical 'source to destination' sequence of steps and, to aid in this, the lists display any current
source and destination assignments.
The display is navigated using Centre Section MASTER Scroller and associated left and right buttons.
M
M M A
MASTER
A
S
T T E
E E R
R
The Scroller's cursor is indicated by a red surround on the currently selected entry, and each selection
turns yellow when it is confirmed.
The Scroller's left button can be used to deselect the current selection and move the cursor back
through the left-hand lists.
Master Scroller
Note that at each stage of the routing process, helpful guidance is shown across the top of the display.
C10 HD Installation Guide
.
) button, located towards the right-hand end of the Project Information Strip near the
I
) button in the User Toolbox which appears:
) button to open the Signal Routing display in the lower
Section 4: Configuration
A: IO Configuration
|
Page 4-17
Need help?
Do you have a question about the C10 HD and is the answer not in the manual?