Emerson Micro Motion 1500 Configuration And Use Manual page 113

Transmitters with analog outputs
Hide thumbs Also See for Micro Motion 1500:
Table of Contents

Advertisement

You can use ProLink III to run a test that displays a test result chart and a test report at the
completion of the test. On-screen directions are provided to manipulate the test data or
export the data to a CSV file for offline analysis.
View test result data using ProLink III
Prerequisites
You can view test result data only if your SMV is licensed and only for tests that were run on
the PC you are currently using.
Procedure
1.
2.
3.
View test result data using the Field Communicator
Prerequisites
You can view test result data only if your SMV is licensed.
Procedure
1.
2.
3.
4.
Configuration and Use Manual
Current process values for mass flow rate, volume flow rate, density, temperature,
and external pressure
Customer and test descriptions (if entered by the user)
Choose Device Tools > Diagnostics > Meter Verification and click Previous Test
Results.
The chart shows test results for all tests stored in the ProLink III database.
(Optional) Click Next to view and print a test report.
(Optional) Click Export Data to CSV File to save the data to a file on your PC.
Navigate to the Smart Meter Verification menu:
Overview > Shortcuts > Meter Verification
Service Tools > Maintenance > Routine Maintenance > Meter Verification
(Optional) If the Field Communicator database is out of date, choose Upload Results
Data from Device.
To view data from the most recent test, choose Most Recent Test Results.
To view data for all tests in the Field Communicator database:
a. Press Show Results Table.
Data from the most recent test is displayed.
b. Press OK to scroll through data from previous tests.
c. To exit the results table, press Abort.
Measurement support
107

Advertisement

Table of Contents
loading

Table of Contents