17.

Analyzer mounting and installation

17.1.

Content of your order

Your analyzer is delivered in a carton box and is protected with special edged protectors.
Please do preserve the packing of your analyzer, for possible back shipment.
17.2.

Installation rules to guarantee explosion protection

The SWG100BIO-Ex. has an ATEX Class 2 certification. To guarantee, that the analyser can be
operated safely in this area, please follow the rules during the mounting and the operation of
the analyser.
17.3.

Prerequisites for installation

Explosion hazard
Before start the mounting and installation work, detect the atmosphere
with a certificate gas detector.
Only educated staff should mounting the analyzer on the stack.
Important
The mounting should be done in pairs.
A measurement point must conform some criterions:
The measurement place must be safeguarding and easily accessible.
The measurement place must have enough space for installation and
maintenance works.
The place should be protected for direct sunlight, rain and squalls.
The area around the analyzer must have enough space.
SWG100 BIOGAS User Manual
DANGER
CAUTION
NOTE
MRU GmbH, D-74172 Neckarsulm

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SWG100 BIOEX and is the answer not in the manual?

This manual is also suitable for:

Swg100 biogas

Table of Contents