Depending on the analyser type, the first or the first and second phase cannot be deleted, deactivated or moved
to another position.
Delete a phase
With
F1
a phase can be deleted. To do this, select the phase, which should be deleted and press F1.
Insert a phase
F3
With
a new phase is inserted in the measurement cycle. With the
types can be selected.
In the title-bar the entire cycle time is shown. It is called "Measurement cycle config."
OK
With
the "Cycle phase details" can be shown and changed.
Configuration of the phase details
In this chapter the different cycle phase details will be explained.
Zeroing (Cycle phase details): In the cycle phase detail "
ZEROING
Measuring site valves
Zeroing valve
Duration
Recommendation
Screenshot shows how a
phase can be deleted. In
this example the last phase
"Measurement SP3" is
deleted.
+
Z
EROING
Valves closed
Valve open
2min to 1 h
5min., in general not to be changed by user as depending
only on analyzer internal setup
SWG100 BIOGAS User Manual
right/left arrow keys
the different phase
=
" the zeroing time can be configured.
MRU GmbH, D-74172 Neckarsulm

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SWG100 BIOEX and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Swg100 biogas

Table of Contents