Installation
3.4 Installation
3.4.1 Preparing for the installation
Parts which must be assembled are prepacked inside each machine section, to-
gether with the necessary bolts, nuts etc.
There are two installation options for the machine: free-standing in the room (1
door) or with a clean and dirty side (2 doors).
The machine can also be installed on the floor or recessed into it.
Check that there is sufficient height available to transport the machine to its instal-
lation site.
The machine supplied with a height for transport purposes of 2750 mm.
The machine can also be supplied in two parts of the following sizes (LxWxH), if
necessary, delivered in smaller components.
1.
2,6x2,0x2,25m
2.
1,9x2,05x0,8m
When the machine is delivered with optional partition (option) mount the plate for
the silo support as shown below.
Check that the overheating protection are set to zero.
WD-18CW
11
Rev. 3,0 (201802)