2. Commissioning
2.3
Commissioning the CPX terminal on the Interbus
2-38
In order to avoid faults (e.g. configuration and parameterisa-
tion faults) during commissioning:
Please observe the general commissioning instructions in
•
the CPX system manual.
Check the DIL switch settings before using and replacing
•
CPX terminals.
Note the instructions for switching on the power supply in
•
section 2.1.5.
Check the configured address range (process data and
•
assigned input and output bytes). If necessary, test the
I/Os.
Check the address assignment of the I/Os on the
•
CPX terminal. In order to do this, you can, if necessary,
force the I/Os (see CPX system manual).
Make sure that the desired parameterisation of the
•
CPX terminal in the initialization phase or after fieldbus
interruptions is carried out by the module. This is to en-
sure that if the CPX terminal is replaced, the new terminal
will also be operated with the desired parameter settings.
Carry out spot checks if necessary to check parameterisa-
•
tion with the handheld.
Festo P.BE-CPX-FB20/21-EN en 1202a