Checklist for manufacturers

The information in the following points must be available at least during first-time commissioning. It may
vary depending on the application and the requirements from the manufacturer/supplier must be checked.
This checklist should be retained or stored with the machine documents so that it can be used as a refer-
ence during recurring tests.
NOTICE
This checklist is not a replacement for the first-time commissioning or the regular testing done
i
by a qualified person.
Tab. 14.1:
Checklist for first-time commissioning
Question
Were the safety guidelines according to the directives/standards valid for the
machine used as a basis?
Are the directives and standards used listed in the Declaration of Conformity?
Does the safety equipment correspond to the required category?
Are the required protective measures against electric shock effective (protec-
tion class)?
Has the protective function been checked in accordance with the testing inform-
ation in this documentation? In particular:
• Functional check of the command devices, sensors, and actuators connec-
ted to the safety control
• Test of all switch-off paths
Have you ensured that a complete test of the safety functions has been carried
out after every configuration change to the safety control?
Leuze electronic
MSI 400
Appendix
Yes
No
Yes
o
No
o
Yes
o
No
o
Yes
o
No
o
Yes
o
No
o
Yes
o
No
o
Yes
o
No
o
98

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents