ClipperCreek ProMountDuo PMD-10T Installation Manual page 13

Pedestal
Table of Contents

Advertisement

INSTALLATION REQUIREMENTS AND CONFIGURATIONS
(continued)
CONFIGURATION E:
Required Equipment for a Combo Dual-Mount Pedestal with one HCS
EVSE and one LCS/ACS EVSE (Two EVSE per Pedestal):
One (1) ClipperCreek ProMountDuo™ Kit, ClipperCreek part number
0300-00-025.
One (1) ClipperCreek HCS EVSE, part number is determined by amperage
and options selected.
One (1) ClipperCreek LCS/ACS EVSE, part number is determined by
amperage and options selected.
Two (2) dedicated branch circuits, voltages dependent upon the EVSE
options selected.
Two (2) circuit breakers, appropriately sized with respect to the charging
capacity of each EVSE.
Appropriately sized service wiring based on EVSE power requirements
(reference EVSE Product manual). Each conductor must have enough length
to comfortably pull all the way through and above the top of the pedestal
(5 feet is adequate).
Two (2) Ground Line conductors (one for each EVSE) or a single bonded
Ground Line with enough length to comfortably pull all the way through and
above the top of the pedestal (5 feet is adequate).
Conduit sized to fit all Live Line and Ground Line conductors.
Four (4) Anchor Bolts with Nuts and Washers (additional washers may be
required for leveling)
ProMountDuo™ PEDESTAL INSTALLATION GUIDE
Page 13
ClipperCreek
CONFIGURATION E
Combo ClipperCreek HCS
and LCS/ACS EVSE
, Inc.

Advertisement

Table of Contents
loading

Table of Contents