Installation Instructions; Installing Tensioning Bands (Clamp-On) - Endress+Hauser Proline Prosonic Flow 90 Operating Instructions Manual

Ultrasonic flow measuring system
Hide thumbs Also See for Proline Prosonic Flow 90:
Table of Contents

Advertisement

3 Installation
18
3.3

Installation instructions

3.3.1

Installing tensioning bands (clamp-on)

For W/P sensors DN 50...200
1.
Push one of the supplied threaded bolts on the tensioning band.
2.
Run the tensioning band around the pipe without twisting it and push the end through the
tensioning band lock (make sure that the screw is pushed up).
3.
By hand, make the tensioning band as tight as possible.
4.
Push the screw down and tighten the tensioning band with a screwdriver so that it cannot slip.
5.
If so desired, shorten the tensioning band to the desired length.
"
Caution!
Risk of injury. When shortening the tensioning band, try to avoid sharp edges.
Fig. 11:
Tensioning band installation for DN 50...200
For W/P sensors DN 250...4000
The following steps relate to Fig. 12 on Page 19.
1.
Measure the pipe circumference.
Shorten the tensioning band to the pipe circumference +10 cm.
"
Caution!
Risk of injury. When shortening the tensioning band, try to avoid sharp edges.
2.
Loop the tensioning band through one of the centering plates supplied with the threaded
bolt (1).
3.
Insert both ends of the tensioning bands down into the openings in the tensioning band lock
(2). Bend back the ends of the tensioning bands.
4.
Interlock both halves of the lock (3). Make sure that there is sufficient space for the tensioning
band to be tightened with the locking screw.
5.
Tighten the tensioning band using a screwdriver (4).
Proline Prosonic Flow 90
A0001109
Endress+Hauser

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents