Installation
12
Adjusting the level monitoring
You have to adjust conductive level monitoring depending on whether you want to connect one,
two or three analyzers to this single collecting vessel.
Depending on the application, mount the right adjusting pin (→ å 8, → å 9, item 2) or do
1.
not use any adjusting pin.
2.
Pull the marked pipe (item 3) downwards in accordance with your application (1, 2 or 3
analyzers) to set an optimum collecting volume.
Fig. 8:
One analyzer
1
M 3x12
2
M 3x35 (adjusting pin)
3
Marking 1
3.4

Installation instructions

To install the analyzer at the intended location, proceed as follows:
1.
Mount the analyzer and secure it to a wall using screws (Ø6 mm / 0.24").
For the installation dimensions, please see the previous chapter.
2.
Using a spirit level, check that the cabinet is hanging or standing straight. Only in this way can
any air bubbles present escape from the cell.
3.
Fit the edge covers (with GFR housing only).
4.
Lay the drain pipe for the reaction products. Where possible, use solid pipes (PVC or PE,
internal diameter 1" with 3% incline).
5.
Screw the screw-in connector ID 16 into the outlet pipe from below. Secure the Grifflex hose
ID 19 to the nozzle with a hose clip (only CA71PH-F).
6.
Insert the valve hoses accordingly. These were partly removed from the valves for
transportation. This prevents the hoses from sticking or pressure being applied to a point in the
hose over an extended period.
CA71→ å 11
1
2
3
a0001367
Fig. 9:
Two analyzers
1
M 3x12
2
M 3x20 (adjusting pin)
3
Marking 2
Stamolys CA71PH
1
2
3
a0001366
Fig. 10:
Three analyzers
1
M 3x12
3
Marking 3
Endress+Hauser
1
3
a0001365