Installation; Incoming Acceptance, Transport And Storage; Incoming Acceptance; Transport - Endress+Hauser Proline Prosonic Flow 90 Operating Instructions Manual

Ultrasonic flow measuring system
Hide thumbs Also See for Proline Prosonic Flow 90:
Table of Contents

Advertisement

Proline Prosonic Flow 90
Endress+Hauser
3

Installation

3.1

Incoming acceptance, transport and storage

3.1.1

Incoming acceptance

• Check the packaging and the contents for damage.
• Check the shipment, make sure nothing is missing and that the scope of supply matches your
order.
3.1.2

Transport

The devices must be transported in the container supplied when transporting them to the measuring
point.
3.1.3

Storage

Note the following points:
• Pack the measuring device in such a way as to protect it reliably against impact for storage
(and transportation). The original packaging provides optimum protection.
• The storage temperature corresponds to the ambient temperature range (Page 99) of the
transmitter, the measuring sensors and the corresponding sensor cables.
• The measuring device must be protected against direct sunlight during storage in order to avoid
unacceptably high surface temperatures.
3 Installation
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents