Connection Check - Endress+Hauser Proline Prosonic Flow 90 Operating Instructions Manual

Ultrasonic flow measuring system
Hide thumbs Also See for Proline Prosonic Flow 90:
Table of Contents

Advertisement

Proline Prosonic Flow 90
Endress+Hauser
Flowrate measuring sensors U (clamp-on)
The flowrate measuring sensors U fulfill all the requirements for IP 54 degree of protection.
Compliance with the following points is mandatory following installation in the field or servicing,
in order to ensure that IP 54 protection is maintained:
• Only use cables supplied by Endress+Hauser with the corresponding sensor connectors.
• The BNC cable connectors (1) must be clean, dry and undamaged.
• Insert the BNC cable connectors (1), do not cant and then tighten them to the stop.
Fig. 40:
Installation instructions for IP 54 degree of protection for BNC sensor connectors
4.5

Connection check

Perform the following checks after completing electrical installation of the measuring device:
Device condition and specifications
Are cables or the device damaged (visual inspection)?
Electrical connection
Does the supply voltage match the specifications on the nameplate?
Do the cables comply with the specifications?
Do the cables have adequate strain relief?
Cables correctly segregated by type?
Without loops and crossovers?
Are the power supply and sensor cables correctly connected?
Are all screw terminals firmly tightened?
Have the measures for grounding/potential equalisation been correctly
implemented?
Are all cable entries installed, firmly tightened and correctly sealed?
Are all housing covers installed and firmly tightened?
1
4 Wiring
A0001140
Notes
Notes
85...260 V AC (45...65 Hz)
20...55 V AC (45...65 Hz)
16...62 V DC
see Page 36, 97
See the wiring diagram inside
the cover of the terminal com-
partment
see Page 40 ff.
see Page 40
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents