SATO M84PRO Service Manual page 87

Thermal transfer printer
Hide thumbs Also See for M84PRO:
Table of Contents

Advertisement

Section 7: Replacement Procedures
6
Connect the power harness to the larger connector (6) and the thermal head harness to the
smaller connector (7) of replacement print head (1) with the head oriented downward.
7
Apply print head (1) with mounting plate (4) attached, to lower side of print assembly (3).
NOTE: When the print head is properly oriented under the print assembly,
two colored alignment dots may be seen through two slots when peering
downward from the top side.
8
Secure replacement print head (1) to print assembly using thumb screw (2).
CAUTION: ENSURE THAT THE WIRING HARNESSES ARE ROUTED IN A
MANNER SO AS TO PREVENT PINCHING AND THAT THEY DO NOT
TOUCH THE HEAD OPENING SPRING. ALSO CONFIRM THAT THE HEAD
MAY BE OPENED AND CLOSED WITHOUT RESTRICTION.
9
Clear the print head counter. Refer to the relative procedure for instructions if required.
10
Reconnect power supply cord, test cycle, and reattach/close all covers.
NOTE: Figures 10-1, 10-2, and 10-3 of the Daigrams & Schematics section
provides guidance on housing cover, media, and ribbon installation.
5
6
M84Pro Service Manual
4
7
1
Figure 7-14, Print Head Replacement
PN:
2
9001111A
3
Page 7-19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents