2
Installation
2.4.3
Setting the DIL switches
1. Switch supply power off.
2. Remove DIL switch cover (è 2.4.1).
3. Perform required settings (è 2.4.4 ... 2.4.7).
4. Reinstall DIL switch cover (è 2.4.1).
Please Note
Parameterisation via DIL switch settings is taken over only when the power supply is
switched on.
2.4.4
Setting the operating mode
With the DIL switch element 1.1 on DIL switch 1 the operating mode of the bus node is set.
Operating mode
Remote I/O operating mode
All functions of the CPX terminal are controlled directly by the
Sercos controller or by a superordinate PLC/IPC. The bus node
takes charge of connection to the Sercos III network.
Remote Controller operating mode
An FEC or CEC integrated into the CPX terminal controls all
functions of the CPX terminal, i.e. the FEC or CEC undertakes the
I/O control. The bus node takes charge of connection to the
Sercos III network.
Tab. 2.2
Please Note
Setting of the operating mode via DIL switch 1 has priority over all other settings.
The switch element 1.2 of DIL switch 1 is reserved and without function.
Festo – P.BE-CPX-FB39-EN – 1504NH – English
Setting DIL switch 1
1.1:
OFF
(factory setting)
1.1:
ON
15