Preparation For Operation; Operation Procedure; Operation Starting - Planar IT-100 Operating Manual

Multisystem tv analyzer
Table of Contents

Advertisement

Perform external examination to make sure your IT-100 is free from any visible
mechanical damage.
Upon receipt of the package, check the availability of the items contained in it against
the list provided (see section 2.3).
If your IT-100 has been kept in the environment other than the rated operating
conditions, leave the Analyzer in facilities with normal operating conditions at least for 2
hours prior to operation.

4.1. Operation starting

Before you start to operate your IT-100 make sure to carefully read this Operating
Manual as well as to inspect the location of the controls and indicators of the Analyzer
(section 2.6.2).
To prepare your Analyzer for operation from an external power source, connect the
Charger to the connector located on the bottom of the Analyzer and then to the power
source. Push and hold the « » key until the LCD backlight turns on.
To prepare your IT-100 for operation in stand-alone mode, powered by batteries,
push and hold the « » key until the LCD backlight turns on.
The following message (figure 4.1) will appear on the screen, when firmware is
started up.
Figure 2.7

3. PREPARATION FOR OPERATION

4. OPERATION PROCEDURE

14

Advertisement

Table of Contents
loading

Table of Contents