Procedure Outline to Operation
§
8
.
P
r
§
8
.
P
r
The procedure outline until turning on the load devices is as follows.
Be sure to follow the procedure outline below to backup the load devices during power outage.
When you do not change
the user setting, proceed
to next step.
When setting
the alarm buzzer does not sound.
25
o
c
e
d
u
r
e
U
n
o
c
e
d
u
r
e
U
Check the default value of the user setting
Charge the UPS
MAIN MCCB to "ON",
Perform the power outage simulation test
Test result: OK
Connect the load devices
Start up the UPS
Turn on the load device power
The backup function is available during power outage.
t
i
l
L
o
a
d
D
n
t
i
l
L
o
a
d
D
⇒ page 26, 35 to 37
When the default settings do not
configurate with your environment or
requirements, change the user settings.
Configure the user setting
⇒ page 27
When setting
MAIN MCCB
the alarm buzzer sounds.
⇒ page 28
Test result: NG
⇒ page 30
⇒ page 31
⇒ page 32
e
v
i
c
e
O
p
e
e
v
i
c
e
O
p
e
User Settings Guide
to "ON",
See §7.1 to connect the battery
connector.
⇒ page 21
See "If power outage simulation test
does not finish properly, check the
following points." to perform
countermeasure.
⇒ page 29